Installation Requirements For Water Ring Pump Line


In the use of water ring vacuum pump in the process of the installation of equipment, but the correct installation is the premise of guarantee the normal work in the future, so during the installation process should pay attention to what we should pay attention to the problem?installation-requirements-for-water-ring-pump-line

(1) derusting, cleaning and assembling of water ring pump equipment:

1. Before installation, the anti-rust oil or dry oil applied on the processing surface must be cleaned and cleaned. Before installation, the rusty parts should be thoroughly removed before assembly.

2. All pipelines on the equipment should be cleaned and kept unimpeded.

3. Be familiar with the drawings and understand the equipment structure before the assembly of the machine parts.

4. When assembling the equipment, it shall first check the appearance shape and dimension precision of the parts and assembly, and confirm that it meets the requirements before assembling.DLV_Series_Double_Stages_Water_Ring_Vacuum_Pumps